by Chirag Borole | Mar 27, 2023 | Boiler Tubes
A boiler tube removal is normally accomplished by cutting the tubes at their outer periphery, heating the stub of the tube, notching the forks of the torches, and thereby forcing the tube loose from the boiler vessel. Boiler tube removal may involve cutting off the...
by Chirag Borole | Mar 20, 2023 | High tensile and Boiler plates
There are a number of ways in which the strength of the material can be categorised, regardless of the industry in which they are used such as hardness, brittleness, etc. and these factors have a direct or indirect effect on the strength of the material. There are...
by Chirag Borole | Mar 13, 2023 | 15-5ph/ 17-4ph Round Bars
Forgings made from 15-5 PH steel are available with the fastest lead times in the industry. We can manufacture custom forgings up to 4,000 pounds, from 2.5″ to 24″ in diameter or thickness, and up to 12′ in length, based on your specifications. A...
by Chirag Borole | Mar 6, 2023 | Pipe Fittings
Welding a pipe involves joining two pipes together in a process called welding. Welding techniques used for pipework include arc welding, as well as MIG or TIG welding, which are both arc welding processes. The term pipeline welding is sometimes used to refer to the...
by Chirag Borole | Feb 27, 2023 | Boiler Tappered Tube Plugs
Boiler Inspection Programs are supposed to enforce nationally adopted standards which govern the installation, operation, maintenance, and repair of boilers and pressure vessels in commercial and public buildings that are part of the building system. Inspections are...